We are currently using Gen4 with a custom field at task level to capture our task codes. 
I want to use the Ria tool to import timesheet data from another system that will quote the task code to ensure the imported timesheets are correctly aligned to the Replicon tasks.  The timesheet templates within the Ria tool don't appear to allow me to include my custom field.

Please can you advise how i can do this?  We also plan to do this on a regular basis.
Photo of Lo, Wai

Lo, Wai

  • 13 Posts
  • 3 Reply Likes

Posted 8 months ago

  • 1
Photo of Aashnee Kamboj

Aashnee Kamboj, Community Moderator

  • 1558 Posts
  • 108 Reply Likes
Hi Wai,

In order to track a custom field at the timesheet level or import it at the timesheet level you will have to add one through the timesheet template. I may be incorrect in understanding the exact scenario. I have requested our support team to reach out to you and help you with the same